Our Process

How your remodel comes together

Twelve steps from the first conversation to life in your finished space. You’ll see the design, the 3D renderings, and the final budget before construction starts, and you’ll get updates every step of the way. Timing shown is typical; every project is different, and we’ll give you a schedule for yours.

  1. Step 1 · Plan

    Initial Meeting

    We start with a conversation, by phone or at your home. Tell us what you want to change, what bothers you about the space today, how you use it, and what budget range you’re comfortable with. We’ll ask questions, share what similar projects usually involve, and be honest about whether we’re the right fit.

    What you get
    A clear sense of what your project involves, the questions to think about, and the next steps. No cost and no obligation.
    Typical timing
    About 30–60 minutes, usually scheduled within a few days of your call.
  2. Step 2 · Plan

    Site Visit & Measurements

    We walk the space with you and take detailed measurements and photos. We look at the things that shape a remodel: wall and floor structure, plumbing and drain locations, the electrical panel and circuits, ventilation, and HVAC. For additions, we also look at the lot, the roofline, and how the new space will tie in.

    What you get
    An accurate picture of existing conditions, so the design and budget are based on your actual house and not guesswork.
    Typical timing
    About 1–2 hours on site.
  3. Step 3 · Design

    Design & Preliminary Budget

    Using the measurements and your wish list, we develop a layout and scope of work and pair it with a preliminary budget broken out by category: demolition, framing, plumbing, electrical, cabinets, tile, finishes, and so on. Where selections aren’t made yet, we use clear allowances so you can see how choices affect cost.

    What you get
    A floor plan or layout concept, a written scope, and a preliminary budget you can react to.
    Typical timing
    Typically 1–3 weeks, depending on project size.
  4. Step 4 · Design

    Review

    We sit down together and go through the design and preliminary budget line by line. This is the time to adjust: move the island, upgrade the shower, phase part of the work for later, or trim scope to hit your number. We revise until the plan and the budget both feel right.

    What you get
    An updated plan and budget that reflect your priorities, with every change explained.
    Typical timing
    One meeting plus revisions, usually 1–2 weeks.
  5. Step 5 · Design

    3D Renderings

    Before anything is torn out, we create 3D renderings of the new space so you can see the layout, cabinetry, tile, and finishes in context. It’s much easier (and less expensive) to change your mind on a screen than after the tile is set.

    What you get
    Realistic 3D views of your finished space to review, share with family, and refine.
    Typical timing
    Usually 1–2 weeks, including a round of revisions.
  6. Step 6 · Build prep

    Final Budget & Selections

    We help you finalize selections: cabinets, countertops, tile, plumbing fixtures, lighting, flooring, hardware, and appliances. With choices locked in, we confirm pricing with our trade partners and suppliers and deliver a final, detailed budget. Any remaining allowances are clearly listed.

    What you get
    A final, itemized budget and a complete selections list, so you know exactly what you’re getting and what it costs.
    Typical timing
    Typically 1–3 weeks, depending on how quickly selections are made.
  7. Step 7 · Build prep

    Agreement & Scheduling

    We put everything in a written agreement: the scope, the final price, the payment schedule tied to progress, how changes are handled, and the warranty. Once it’s signed, we set a start date, order long-lead items like cabinets and custom glass, and build the project schedule.

    What you get
    A signed agreement, a start date, and a project schedule with key milestones.
    Typical timing
    Start dates depend on our schedule and material lead times; we’ll give you a realistic date up front.
  8. Step 8 · Build prep

    Permits

    Where your project requires permits, we prepare and submit the applications and coordinate with the local codes office. Additions and projects that change structure, plumbing, or electrical usually need permits; we’ll tell you exactly what applies to your project. If you have an HOA, we’ll help you get what they need too.

    What you get
    Peace of mind that the work is permitted and inspected the way it should be.
    Typical timing
    Varies by city and county, from a few days to several weeks. Additions usually take longest.
  9. Step 9 · Build

    Start of Construction

    Before day one, we walk through the plan with you: work areas, access, where materials and the dumpster will go, and how we’ll protect your floors, furniture, and the rooms you’re still living in. Then we set up dust protection and begin demolition and rough-in work.

    What you get
    A protected home, a clean and organized jobsite, and a crew that respects your space.
    Typical timing
    Kitchens and baths often run several weeks; additions and whole-home projects take longer. Your schedule spells it out.
  10. Step 10 · Build

    Progress Updates & Client Portal

    You’ll always know where things stand. From the day we start, you get a private login to our client portal, where you can follow your project from anywhere: the daily log with jobsite photos, the schedule and current phase, your budget and billing (contract total, deposit, and remaining balance), an allowance tracker that compares each allowance to the selections you made, your plans, 3D renderings and selections, and your project documents. Every portal page has a message box that goes straight to our team. You’ll also hear from us directly at key milestones like rough-in inspections, tile, and cabinet installation. If anything changes, we put it in writing and get your approval before the work is done.

    What you get
    24/7 access to your client portal (daily logs and photos, schedule, budget and allowance tracking, plans, renders, selections, and documents) plus regular check-ins and written approval for any change.
    Typical timing
    Ongoing, throughout construction. See what’s in the portal →
  11. Step 11 · Finish

    Final Walkthrough & Punch List

    When the work is complete, we walk the finished space with you and write down anything that needs attention: a touch-up, an adjustment, a missing piece of trim. We finish every item on that list, complete any final inspections, and leave the space clean.

    What you get
    A completed punch list, passed final inspections where required, and a space that’s ready to use.
    Typical timing
    Walkthrough takes about an hour; punch items are usually wrapped up within a week or two.
  12. Step 12 · Finish

    Warranty & Aftercare

    Our relationship doesn’t end at the last invoice. We’ll hand over product information and care instructions for your new finishes and fixtures, and the warranty terms in your agreement. If something comes up, call us and we’ll take care of it.

    What you get
    Warranty documentation, care and maintenance info, and a contractor who answers the phone.
    Typical timing
    We check in after the project, and we’re a phone call away after that.
Our Promises

What you can count on


No surprises

You approve the design, the renderings, and the final budget before we start, and every change is written down and approved before the work is done.

Respect for your home

Floors and furniture protected, dust controlled, and a jobsite cleaned up every day, because you’re living there.

Owners on every job

Travis and Andy are involved from the first meeting to the final walkthrough. You’ll always know who to call.

Let’s Talk

Ready for step one?

The initial meeting is free, with no obligation. Tell us a little about your project and we’ll set up a time to talk.